or call 800-355-4628
Description
These forms are valuable tools for evacuation leadership as they oversee event progress, document evacuee movement, and log critical recordkeeping data. Proprietary job aides developed by DQE and aligned with the Hospital Incident Command System (HICS) and the Nursing Home Incident Command System (NHICS). Available to restock your PACE Evacuation Toolbox (IC3000) or to add to your own evacuation plan supplies.
Available As
- PACE Evacuation Forms Pack (IC3010)
Specifications
PACE Evacuation Forms Pack (IC3010)- Each form has one yellow duplicate copy
- Instructions are printed on the back of each form
- Each pack includes:
- Area Evacuation Worksheet
- The worksheet can be used by the Evacuation Group Supervisor/EGS (Area Manager) to summarize key information about their area occupants in preparation for evacuation and to track evacuee movement while under their supervision. The worksheet can also be used by the Evacuation Branch Director to orchestrate and track evacuee movement through the evacuation process.
- Populate this worksheet with data from the Evacuee Information & Tracking Form, Evacuation Status Log or similar documents.
- Evacuation Status Log
- Used to document the mobility level and evacuation status of each occupant, on a particular floor, unit, or department, in preparation for evacuation.
Contents
- Area Evacuation Worksheet - 20 two-part forms
- Evacuation Status Log - 20 two-part forms